FANTM.
AI-generated
Service III

Every module, every fault on one map

Radiometric thermography to IEC TS 62446-3: hotspots, defective bypass diodes, substrings and shading detected per module, georeferenced and documented for warranty claims.

The principle

Yield is lost quietly.

A defective module lowers the yield of an entire string without the inverter raising an alarm. From the air we inspect the entire module area in one flight, at an irradiance of at least 600 W/m², and assign every finding to a module. Your maintenance team gets a map, not a suspicion.

Deliverables

What you receive

01

Fault report per module

Classified to IEC TS 62446-3: hotspot, bypass diode, substring, cell crack, shading, soiling.

02

Georeferenced fault map

Every finding with its position in the site plan, directly accessible for repair.

03

RGB detail images

48 MP per module: glass breakage, delamination, snail trails, substructure.

04

Proof after maintenance

Verification flight with an identical flight plan: fixed faults documented, open ones visible.

Process

From briefing to report

  1. Installation data

    Module type, string plan, yield data and access. We plan the flight around the irradiance.

  2. Flight

    Grid flight under clear skies and high irradiance, thermography and RGB in a single pass.

  3. Analysis

    Findings classified per module and matched against the string data.

  4. Report

    Fault report and map within 48 hours, recommendations included.

Key figures

The technology behind it

640 × 512
Radiometric thermography
48 MP
RGB detail
IEC TS 62446-3
Inspection standard
48 h
Report delivery
Questions

Frequently asked questions

  • Clear skies, an irradiance of at least 600 W/m², little wind and dry modules. On the Costa del Sol these conditions are met on most days of the year.

  • Yes. The report follows IEC TS 62446-3 and documents every finding radiometrically and georeferenced. That is the basis manufacturers and installers work with.

  • Once a year as standard, every six months for larger installations or after storms. In the Aerial PV Monitor package we set the cadence together.

Next step

Your installation, inspected module by module.

Describe your property and your question. You receive a tailored proposal within two working days.

Confidential, without obligation, answered within two working days.